xxxx在线高清免费视频_a级毛片不卡在线播放_亚洲无码一级片在线播放_亚洲另类无码首页专区

    Contact us


    TEL:022-24832616
    FAX:022-24982771
    PHONE:13820942008
    MALI:tjbobeijd@163.com
    ADDRESS:Dongli Economic Development Zone, Tianjin, 11 weft Road, No. four, Fortune Plaza, A, block B, floor 29, No. 8

您當(dāng)前的位置:Home >> News Center >> Company >> Browse

Tianjin Bobei Construction quality and schedule co

Time:2017-11-29  Author:  Hit:1211

在施工管理工作中,質(zhì)量、進(jìn)度和安全一直是現(xiàn)場(chǎng)管理技術(shù)人員最為重要的工作內(nèi)容,一點(diǎn)也不能馬虎,否則,所產(chǎn)生的嚴(yán)重后果將不堪設(shè)想,在工程質(zhì)量控制中,要堅(jiān)持以相關(guān)的質(zhì)量保證體系為主線,以施工規(guī)范和國(guó)家質(zhì)量標(biāo)準(zhǔn)為準(zhǔn)繩,用實(shí)際數(shù)據(jù)來(lái)說(shuō)話,堅(jiān)持質(zhì)量第一,堅(jiān)持以人為控制核心,堅(jiān)持以預(yù)防為主,堅(jiān)持質(zhì)量標(biāo)準(zhǔn),貫徹科學(xué)、公正、守法的職業(yè)規(guī)范。
In construction management, quality, schedule and safety has been the most important work for the management of technical personnel, it can not be sloppy, otherwise, serious consequences will be unbearable to contemplate, in the engineering quality control should adhere to the relevant quality assurance system as the main line, with construction specifications and quality standards of the state as the criterion, using actual data to speak, adhere to the quality first, adhere to the human control of the core, adhere to prevention, adhere to quality standards, implement the scientific, impartial, occupation standard law.
一、工程質(zhì)量控制
Engineering quality control
1、始終堅(jiān)持以質(zhì)量求生存,以信譽(yù)求發(fā)展的經(jīng)營(yíng)理念,制定切實(shí)可行的質(zhì)量計(jì)劃和進(jìn)度計(jì)劃及相應(yīng)的技術(shù)保證措施,明確相關(guān)人員的職責(zé),始終使質(zhì)量和進(jìn)度處于可控壯態(tài)。
1, always adhere to the quality of survival, to the credibility of development management, formulate feasible quality plan and schedule and corresponding technical measures, clear responsibilities of relevant personnel, always make quality and progress in controllable condition.
2、事前、事中、事后的質(zhì)量控制手段
2, in advance, in the matter, after the quality control measures
由于工程質(zhì)量本身具有影響因素多、質(zhì)量波動(dòng)大、變異大等特點(diǎn)。所以,對(duì)工程質(zhì)量應(yīng)重視事前控制、事中嚴(yán)格監(jiān)督,防范于未然,將質(zhì)量事故消滅于萌芽之中。事后以質(zhì)量保證體系為依據(jù),按施工過(guò)程、檢驗(yàn)和試驗(yàn)、不合格品控制、糾正和預(yù)防措施程序的要求進(jìn)行具體的質(zhì)量控制。
Because of the quality of the project itself has many factors, such as high quality, large variation, and so on. Therefore, attention should be paid to beforehand control, strict supervision of the quality of the project, to take preventive measures, the quality accident nipped in the bud. In the event of quality assurance system as the basis, according to the construction process, inspection and testing, control, corrective and preventive measures of the requirements of the specific quality control procedures.
①、施工前控制
Pre construction control
在前期準(zhǔn)備工作中,注重抓好施工技術(shù)準(zhǔn)備工作,對(duì)工程設(shè)備和人員要求嚴(yán)格審查。在實(shí)際工作中具體要做好以下工作:
In the preparatory work, pay attention to the construction of technical preparation, the requirements of the engineering equipment and personnel to strictly review. In the actual work to do the following work:
A、抓好施工前圖紙會(huì)審、技術(shù)交底工作。
A, well before the construction drawings, technical clarification.
B、要求進(jìn)場(chǎng)的管理人員都能持證上崗,對(duì)不能滿足質(zhì)量要求的管理人員和操作人員及時(shí)更換.
B, the management personnel can request entry certificates, can not meet the quality requirements of the management and operating personnel timely replacement.
C、對(duì)施工機(jī)械設(shè)備進(jìn)行過(guò)程能力評(píng)審:審查其施工機(jī)械設(shè)備的選型是否恰當(dāng),審查施工機(jī)械設(shè)備的數(shù)量是否足夠,所有裝備的施工機(jī)械設(shè)備是否都處于完好的可用狀態(tài)等等。
C, on construction machinery and equipment for process capability evaluation: review the selection of construction machinery and equipment is appropriate, the number of construction machinery and equipment to review the adequacy of construction machinery and equipment all equipment are in good condition and available.
D、抓好材料訂貨前的評(píng)審、質(zhì)量、價(jià)格、供貨能力的信息,選擇好供貨廠家,獲得質(zhì)量好的材料資源,從而確保工程質(zhì)量,降低工程造價(jià)。對(duì)主要材料、設(shè)備及構(gòu)配件在訂貨前,要求供貨廠商提供詳細(xì)技術(shù)資料,經(jīng)審定后,方可定貨。對(duì)主要工程材料及配件,并在訂貨前要求廠家提供樣本或看樣訂貨,會(huì)同業(yè)主進(jìn)行定板工作,保證材料質(zhì)量符合規(guī)劃要求。
D, do a good job of the material before the assessment, quality, price, supply capacity of information, choose good suppliers, access to good quality material resources, thereby ensuring project quality, reduce the cost of the project. The main materials, equipment and fittings before ordering, requires suppliers to provide detailed technical information, after examination, before ordering. The main engineering materials and accessories, and in order to require manufacturers to provide samples or sample order, will be the same with the main board to work to ensure that the quality of materials in line with the planning requirements.
E、開工前對(duì)建設(shè)單位提供的施工測(cè)量控制網(wǎng)進(jìn)行復(fù)測(cè),檢查檢驗(yàn)、測(cè)量和試驗(yàn)設(shè)備的周期檢定情況和可用狀態(tài),對(duì)無(wú)證和有問(wèn)題的設(shè)備規(guī)定不準(zhǔn)在現(xiàn)場(chǎng)使用,保證工程測(cè)量和檢測(cè)的準(zhǔn)確。
Construction surveying control network for the construction unit of E, before the start of the retest, periodic verification inspection, measuring and test equipment and the available state of undocumented and problematic equipment provisions are not allowed to use in the field, to ensure the engineering measurement and detection accuracy.
F、開工前抓好對(duì)質(zhì)量通病的預(yù)防措施:項(xiàng)目部在工程開工前,專門針對(duì)質(zhì)量通病制訂了消滅質(zhì)量通病計(jì)劃,要求每個(gè)分項(xiàng)工程開工前,由項(xiàng)目技術(shù)負(fù)責(zé)人對(duì)施工技術(shù)人員和作業(yè)班級(jí)進(jìn)行詳細(xì)的技術(shù)交底,組織施工班組學(xué)習(xí)施工操作規(guī)程,了解質(zhì)量通病的治理措施。
F, before the start of a good grasp of quality defects prevention measures: project department before the start of the project, specifically for the quality problems for eliminate quality defects plan, each sub project started, the project technical responsible for detailed technical tests of construction and technical personnel and working class, organize the construction team to study the operation rules for construction, understand quality control measures.
②、施工過(guò)程中控制
Control in the construction process
A、實(shí)施現(xiàn)場(chǎng)監(jiān)督與檢查:在施工過(guò)程中,項(xiàng)目部管理人員應(yīng)加強(qiáng)對(duì)現(xiàn)場(chǎng)旁站監(jiān)督與檢查,及時(shí)發(fā)現(xiàn)違章操作和不按規(guī)劃要求、不按施工圖紙、施工規(guī)范、規(guī)程和質(zhì)量標(biāo)準(zhǔn)施工的現(xiàn)象,對(duì)于不符合質(zhì)量要求的及時(shí)進(jìn)行糾正和嚴(yán)格控制。
A, the implementation of on-site supervision and inspection in the construction process, the project management staff should strengthen the on-site supervision and inspection, timely detection of illegal operation and not in accordance with the planning requirements, according to the construction drawings, construction specifications and quality standards for construction of the phenomenon, with the timely corrective and strictly control the quality requirements the.
B、對(duì)進(jìn)場(chǎng)建筑材料先進(jìn)行目測(cè)檢查,并按見證取樣要求會(huì)同監(jiān)理進(jìn)行送檢,檢驗(yàn)合格后才能使用。隨時(shí)檢查材料出廠檢驗(yàn)報(bào)告以及工程所要求符合使用的相關(guān)參數(shù),對(duì)于需要工具測(cè)量的一定要進(jìn)行測(cè)量。
B, on the approach of building materials to visually inspect, and according to the requirements of inspection in conjunction with the witness sampling supervision, inspection before use. At any time to check the material factory inspection report and the engineering requirements for the use of relevant parameters, for the need to measure the tool must be measured.
C、加強(qiáng)工序的檢查、工序交接檢查及隱蔽工程檢查。嚴(yán)格自檢、互檢和交接檢制度。規(guī)定隱蔽工程驗(yàn)收必須經(jīng)過(guò)項(xiàng)目部和監(jiān)理公司檢查確認(rèn),才允許進(jìn)入下一道工序施工每道工序完成后先經(jīng)作業(yè)班組自檢合格后,項(xiàng)目部再?gòu)?fù)檢確認(rèn)。
C, strengthen the inspection process, the process of transfer inspection and concealed work inspection. Strict self inspection, mutual inspection and inspection system. Provisions of concealed engineering acceptance must pass through the project department and supervision company inspection and confirmation, is allowed to enter the next procedure construction after each procedure after operation team self qualified, the project department once again confirmed.
D、施工過(guò)程中,要求各專業(yè)工種管理人員及時(shí)到位進(jìn)行現(xiàn)場(chǎng)管理和指導(dǎo)工人操作,將返工減少到最低。
D, construction process, the requirements of each professional type of management personnel in place to conduct on-site management and guidance of the workers, the rework will be reduced to a minimum.
E、及時(shí)按規(guī)范做好工程技術(shù)資料收集整理工作,保證工程竣工前將工程技術(shù)資料及時(shí)提交給相關(guān)部門核查。
E, timely according to the specifications of the engineering and technical data collection and finishing work, before the completion of the project to ensure the timely submission of engineering and technical information to the relevant departments for verification.
F、進(jìn)入工程分項(xiàng)、分部工程施工階段時(shí),應(yīng)在各專業(yè)工種的試樣驗(yàn)收合格后,方能全面鋪開施工。這一作法(實(shí)物對(duì)比)有助于對(duì)分項(xiàng)工程質(zhì)量進(jìn)行定位和控制,應(yīng)該養(yǎng)成一種習(xí)慣的作法。
F, to enter the project sub branch, division of the construction phase, should be in the professional work of the test sample after passing, can be fully rolled out construction. This approach (in kind) helps to position and control the quality of the project, and it should develop a habit.
③、事后的質(zhì)量控制
Quality control after the event
A、出現(xiàn)對(duì)工程有影響的不合格品如:電纜、管道、配件等,必須堅(jiān)決返工重做,這是一條處理不合格品的重要原則。
A, the impact of the emergence of substandard products such as: cables, pipes, fittings, etc., must be resolutely rework rework, which is an important principle to deal with substandard goods.
B、進(jìn)入施工階段,對(duì)于不合格部位,各專業(yè)工種管理人員必須在現(xiàn)場(chǎng)實(shí)物及施工日記上做好記錄,及時(shí)安排返工,并經(jīng)驗(yàn)收合格后,才能進(jìn)入下一工序施工。
B, entered the construction phase, for the unqualified parts, various types of professional management personnel must make a record in real scene and construction diary, arrange rework, and after acceptance, in order to enter the next working procedure.
C、制訂成品防護(hù)措施,定專人檢查和督促各施工現(xiàn)場(chǎng)做好半成品防護(hù)和成品保護(hù)工作。要求作業(yè)班組在拆除設(shè)備及其它
C, the development of product protection measures, check and supervise the work of the construction site to do a good job in the protection of semi-finished products and finished products. Require the operation team to remove equipment and other